The company undertakes the design of a 30000 ton/year polyether polyol plant project for Kolya Polyol (Nanjing) Co., Ltd.
This project started engineering design in November 2005, completed preliminary design by the end of December 2005, and completed construction drawing design by the end of June 2006. This equipment was put into production in December 2006.